Madison Elementary School was originally constructed in the 1950’s, with additions in the 1960’s and 1980’s. The new 2 story, 79,500 sf building features 30 classrooms, a library, theater, gymnasium, restaurant (cafeteria), kitchen, and administrative offices.
General Contractor: Lydig Construction
Subcontract Amount: $2,237,000.00
Size: 79,500 SF
Scope:
- Exterior Metal Framing
- Exterior Sheathing
- Interior Metal Framing
- Interior GWB
- Acoustic Ceilings